project NAME
MUST University Expansion
project scope
BUILDING CONSTRUCTION
Delivery Date
2023
project NAME
MUST University Expansion
project scope
BUILDING CONSTRUCTION
Delivery Date
2023
project info

The construction of Misr University for Science and Technology Expansion “MUST” in 6th of October City (Phase 1) with a total built-up area of 195,000 m2. The project consists of a semi-independent building (3 basements, ground floor, first floor, and two typical floors) In addition to construction of: • Four separate buildings connected by main corridors, metal bridges, and three basement floors. • Two administrative buildings (Ground, First, and Second Floor) with air conditioning rooms, elevators, and stairs, as well as waiting areas in the three basements. Project is divided into two phases of construction: Phase 1 : Scope of work includes (Excavation, Backfilling, Plain Concrete, Reinforced Concrete works for foundations about 150,000 m3, and reinforced steel about 20,000 tons). Phase 2: Scope of work includes all electromechanical works and high standard finishing.

0
1
2
3
project numbers
Client:
Misr University for Science and Technology
Project Location:
Egypt- 6th of October City
Project Area:
195,000 sqm