project NAME
MUST University Expansion
project scope
BUILDING CONSTRUCTION
Delivery Date
2023
project NAME
MUST University Expansion
project scope
BUILDING CONSTRUCTION
Delivery Date
2023
project info

The Misr University for Science and Technology expansion project - (MUST) in 6th of October City has a total built-up area of 195,000 m2. The scope of work included constructing a semi-independent building that includes 3 basements, a ground floor, a first floor, and two typical floors. Construction work included 4 separate buildings connected by main corridors, metal bridges, and 3 basement floors, with waiting areas in each, as well as 2 administrative buildings (ground, 1st, and 2nd floors), with air conditioning rooms, elevators, and stairs. The project is divided into two phases of construction. Phase 1 includes excavation, backfilling, plain concrete, reinforced concrete works for foundations of about 150,000 m3, and reinforced steel weighing about 20,000 tons. Phase 2 includes all electromechanical works and high standard finishing.

0
1
2
3
project numbers
Client Name:
Misr University for Science and Technology (MUST)
Project Area:
195,000 m2
Project Location:
Egypt- 6th of October City