project NAME
Abu Quir Industrial Waste Water Treatment Plant
project scope
INFRASTRUCTURE & T-PLANT
Delivery Date
2015
project NAME
Abu Quir Industrial Waste Water Treatment Plant
project scope
INFRASTRUCTURE & T-PLANT
Delivery Date
2015
project info

The Industrial wastewater treatment plant project in Alexandria included the construction of the main treatment building consisting of a ground floor, a 15 m high first floor, and two 5 m high floors. A mixing tank, which is a circular concrete tank that is 20 m in diameter and 18 m in height was built, as well as a sludge thickener that is 12 m diameter, and 4 m in height, and 3 sludge dewatering buildings. Also included in the execution of this project were R.C bases with different dimensions for tanks and equipment erected by Bamag as an MEP consortium member.

0
1
2
project numbers
Client Name:
Fertilizers & Chemicals Company (AFC)
Project Location:
Egypt- Abu Quir - Alexandria
Project Capacity:
16,500m3/day